Maharashtra | Pwd Dsr 2017-18

This specific DSR period began heavily emphasizing the inclusion of newer construction practices, such as incorporating plastic waste into road construction and prioritizing specific grades of design-mix concrete ( and above) rather than crude nominal mixes. 👎 Limitations & Challenges Mid-Year Disruption:

It covers a wide range of tasks from basic excavation to advanced structural work.

It accounts for differences in costs between rural areas and major municipal corporations/councils. pwd dsr 2017-18 maharashtra

Use the unit rate given in the document, ensuring any necessary location-based corrections (e.g., city vs. rural) are applied.

The turning point came when a powerful contractor from Thane sent a "proposal" to the office—a red envelope containing a suggestion to keep rates high for "premium work" but low for "rural roads," effectively creating a loophole for substitution of materials. This specific DSR period began heavily emphasizing the

Think of the DSR as the government’s official price list for construction. It includes:

When accessing the DSR 2017-18, users should look for: Use the unit rate given in the document,

Contractors were required to submit their bids . If a contractor’s quoted rate deviated substantially from the DSR without valid justification, the bid could be disqualified. This mechanism prevented both underbidding (which could compromise quality) and overcharging (which could waste public money).

: A specific breakdown of unit costs for materials such as cement, steel, and paint. A reference copy is available at Scribd - Maharashtra PWD Material Rates .

Search Hint: Use the exact phrase along with site:mahaepwd.gov.in to locate official backups.

This DSR was valid from April 1, 2017, to March 31, 2018 (FY 2017-18). It has since been superseded by DSR 2018-19, 2019-20, and later editions.